Delhi: Steps taken to settle down dust in Vasant Kunj, DDA informs NGT
In a report submitted to NGT on November 20, DDA said it had paved a 380-metre stretch in the area. While 330-metre-stretch has been paved with bituminous concrete, the remaining 50 metres with cement concrete, it added.
Post Comment